Under Construction....
Feb. 4th, 2015 05:36 amInside is pretty much done...thankfully. All that's left is to get the fireplace Inspected as so to be able to use it. Probably'll happen about the time it's too Warm to use it;>.
Right now the big non-Botanical project is the storage sheds. There's a lot of stuff the previous owners and their Contractors left. Their personal stuff(they left no forwarding info)in the 1st has been Recycled or tossed. Contractor/Remodeling stuff moved to the 2nd. The 2nd is today's project. Sort to Keep/Toss/Recycle and divide R into Goodwill and Habitat for Humanity. This includes dragging two toilets from the backyard to the shed. Once that's done I can call H4H(they pick up)and once that's gone take the rest to G(they DON'T). Then I can use the 2nd as Storage and make the 1st into a workshoppe.
Veg seeds and the 'Ugli' Mandarin tree has been ordered. I'll be picking up some Compost today and this weekend hope to have the back done(well, until I start more plants or order them;>).....
Cheers,
Pat
Right now the big non-Botanical project is the storage sheds. There's a lot of stuff the previous owners and their Contractors left. Their personal stuff(they left no forwarding info)in the 1st has been Recycled or tossed. Contractor/Remodeling stuff moved to the 2nd. The 2nd is today's project. Sort to Keep/Toss/Recycle and divide R into Goodwill and Habitat for Humanity. This includes dragging two toilets from the backyard to the shed. Once that's done I can call H4H(they pick up)and once that's gone take the rest to G(they DON'T). Then I can use the 2nd as Storage and make the 1st into a workshoppe.
Veg seeds and the 'Ugli' Mandarin tree has been ordered. I'll be picking up some Compost today and this weekend hope to have the back done(well, until I start more plants or order them;>).....
Cheers,
Pat